New Meadows Range Barn
View on SAM.gov ↗ Sign in to save
- Type
- Contract
- Notice type
- Combined Synopsis/Solicitation
- Agency
- AGRICULTURE, DEPARTMENT OF
- Sub-agency
- FOREST SERVICE
- Office
- PAYETTE NATIONAL FOREST
- Solicitation #
- 1240LT27Q0027
- Posted
- Oct 28, 2026
- Response due
- Nov 29, 2026
- Archive date
- Dec 13, 2026
- NAICS
- 237110
- PSC
- Z2JZ
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- ID, 83638, USA
- Contact
- Derrick A Dodson · derrick.dodson@usda.gov
- Source
- SAM.gov
Description
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654. B. Base work includes the following described below: 1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing. 2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces. 3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces. 4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required. C. Optional work includes the following described below: 1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers. D. Quantities associated with these options are identified in the Schedule of Items