Tunnel 9 Pitch Upgrade
View on SAM.gov ↗ Sign in to save
- Type
- Contract
- Notice type
- Solicitation
- Agency
- DEPT OF DEFENSE
- Sub-agency
- DEPT OF THE AIR FORCE
- Office
- FA9101 AEDC PKP PROCRMNT BR
- Solicitation #
- FA9101T9PU
- Posted
- Nov 6, 2026
- Response due
- Dec 10, 2026
- Archive date
- Dec 25, 2026
- NAICS
- 332912
- PSC
- 4320
- Set-aside
- Small Business Set Aside - Total
- Place of performance
- Silver Spring, MD, 20903, USA
- Contact
- Maddux Golden · maddux.golden@us.af.mil
- Source
- SAM.gov
Description
The Arnold Engineering Development Complex (AEDC) Tunnel 9, located in Silver Spring, MD, requires the comprehensive modernization of a high-performance hydraulic motion system. The scope of this Firm Fixed-Price (FFP) requirement includes the design, engineering, procurement, off-site fabrication, pre assembly, on-site demolition, installation, and commissioning of core system components. All components must comply with ASME B31.1, ASME BPVC VIII, and ISO 4406 standards. Core components include: • Primary control valve (step response time of 55 ms or less) • Main actuating cylinder (working stroke of 120.5” capable of achieving a linear speed of 13 ft/s) • Hydraulic Power Unit (HPU) • Dedicated filtration and cooling "kidney" loop.